PRAETIR / Guides

Import trading data with CSV

A successful import begins with a file you can reconcile. The column reference explains the trade-list format recognized by PRAETIR’s importer. Eight synthetic NQ trades shown on this page demonstrate how to reconcile results and costs.

Check columns and number conventions

The trade-list format uses Account, Symbol, Contract, Entry Date, Exit Date, Side, Quantity, Gross P/L and Net P/L. Check the delimiter and decimal convention in your own export. The difference between gross and net results is used as the cost amount.

Dates and times use YYYY-MM-DD HH:mm:ss. The timestamp columns do not carry a time-zone identifier, so document the export zone separately. The sample defines its times as UTC; this is a property of the example, not an automatic conversion performed by the importer.

Check the target account and preview

Choose the target account explicitly in the import dialog. The file’s Account column does not replace that choice. Before saving your own file, check the preview for trade count, sides, quantities and date assignments. The table here is a visible reconciliation example.

Use reconciliation totals

The on-page example reconciles to USD 150 before costs, USD 40 in costs and USD 110 after costs. If it does not, first check decimal separators, signs and double-counted costs. Also check for trades already imported. Reconcile your own records against the totals in the original export.

A reproducible example

Synthetic dataset · 8 NQ trades · USD · Timestamps in UTC
The same eight trades — before and after costs
MeasureBefore costsAfter costs
Sum of winning trades (USD)550.00530.00
Absolute sum of losing trades (USD)400.00420.00
Balance: wins minus losses (USD)150.00110.00
Profit Factor1.3751.262

USD 550 in wins − USD 400 in losses = USD 150 balance before costs. After 8 × USD 5 in costs, USD 110 remains. Net profit factor first deducts costs from each trade: 530 / 420 ≈ 1.262.

Balance before costs
150.00 USD
Total costs
40.00 USD
Balance after costs
110.00 USD
Profit factor after costs
1.26
Expectancy per trade
13.75 USD
Max. drawdown
175.00 USD
#Entry (UTC)Trade before costsCostsTrade after costsPlan followed
12026-09-10 13:30:00150.005.00145.00Yes
22026-09-10 13:40:00-100.005.00-105.00Yes
32026-09-10 13:50:00250.005.00245.00Yes
42026-09-10 14:00:00-150.005.00-155.00Yes
52026-09-10 14:10:0050.005.0045.00No
62026-09-10 14:20:00-50.005.00-55.00Yes
72026-09-10 14:30:00100.005.0095.00Yes
82026-09-10 14:40:00-100.005.00-105.00No

PRAETIR SYSTEMS

From understanding to your own review.

Explore the analytics platform or request access to the current early-access program.

Request early access ↗